Slope sunshade concrete remaining at Ground Floor level and First Floor are completed.Plastering top of these slope sunshades also done in time to enable specialised clay tile laying workers from Trichur staying at site to complete tile laying on slope roofs and slope sunshades.Picture shows First Floor slope sunshade at North side