Wednesday, December 24, 2008

Front view


Picture shows current front view from the gate side

A closer look of charupady


Picture shows a closer look of Charupady and clay tile laid on Balcony floor

Tuesday, December 23, 2008

Charupady for Balcony area


Picture shows view of Charupady for Balcony area - view from ground level.Traditional charupady is done in Teak wood.Polishing pending

One more view-Clay tile for inside room floor


Picture shows one more closer view of clay tile laid inside rooms after polishing

Teak wood panelling by the side of stair


Picture shows Teak wood panelling by the side of stair.Polishing work pending

Clay tile flooring inside rooms


Picture shows clay tile laid inside bed rooms of Ground Floor , Home theatre and Utility rooms.Cost of clay tiles are much less compared to granite or ceramic tiles.It gives good appearance and it is more eco friendly and healthy for those who uses the room

Teak wood Arch between living and dining


Picture shows work in progress of Teak wood Arch between living and dining.Polishing work is pending

Teak wood panelling of walls-Living room


Picture shows work in progress for teak wood panelling of living room walls.On top of this panelling, hand carved work will come.Polishing of wood is also pending

Thursday, November 20, 2008

Design plastering of Arch in balcony


Design plastering of Arch in balcony is completed.With painting it will look much more elegant.Picture shows the Arch

Clay tile laying on flat roof


Workers from the clay tile factory at Trichur has come to lay clay tiles on roof top and inside rooms.Picture shows clay tiles being laid on roof top

Tuesday, November 18, 2008

Granite laying completed


Granite and granite tile laying inside rooms except for Ground Floor bed rooms and First Floor Home theatre and wash room is completed and Clay tile laying on rest of the rooms and Flat roof tops is started today.Picture shows granite laid for stair case area

Wednesday, November 12, 2008

North west view


Picture shows north west view with three mukhappu,clay tile laying on slope roofs

and slope sunshade beedings getting completed

North side slope sunshades nearing finishing


With clay tile laid,beedings above thoomanam done,slope sunshade bottom plastering completed,north side is now ready for painting.Picture shows north side view

Sunday, November 2, 2008

South west corner


Picture shows south west corner with clay tile laid on slope sunshades and design plastering of parapets

Clay tile laying on slope roofs


Clay tile laying on slope roofs completed on 2,Nov,08.Picture shows clay tile laid on slope roofs and slope sunshades

Friday, October 24, 2008

Slope sunshade Concrete getting completed


Slope sunshade concrete remaining at Ground Floor level and First Floor are completed.Plastering top of these slope sunshades also done in time to enable specialised clay tile laying workers from Trichur staying at site to complete tile laying on slope roofs and slope sunshades.Picture shows First Floor slope sunshade at North side

Design Plastering for outside Arch


Our Design plastering team has started work on design Plastering of outside Balcony Arch to make it look almost as elegant as wood panelled Arch coming between Living and dining.Picture shows work in progress

Tile laying on slope roof


Workers from Kapindia Tiles,Trichur has come and started laying clay tiles on slope roof.Picture shows tiles being laid

Friday, October 17, 2008

Rest of slope sunshades


Work is getting completed for balance portion of slope sunshades.Concreting will be done on 20/10 for Ground Floor and First Floor balance portion of slope sunshades.Picture shows work in progress for Ground Floor slope sunshade

View from outside stair


Picture shows view from outside stair landing as of today.Clay tile laying for floor , Clay tile laying for slope roof,painting and other finishing works are pending.

We have obtained approval from Corporation of Cochin for compliance of construction as per approved Plan and as per Kerala Building rules as applicable as on date.Corporation has issued Completion of work and occupancy certificate for the building.We have already processed application for numbering of the building and tax assessment for the building from Corporation of Cochin

Hand rail for outside stair to roof top


Hand rail posts of cast iron and handrails of GI pipe fabricated and fiited for outside stair going upto roof top.Picture shows outside stair before painting and finishing

Wednesday, October 15, 2008

Wall tiles in First Floor toilets


Picture shows wall tiles laid on walls of first Floor toilets before pointing and finishing

with vertical border and motif with picture in green and yellow colours

Saturday, October 11, 2008

Design work for Mukhappu


Design plastering work done for three Mukhappu on top of slope roofs.Picture shows work in progress.Final picture can be seen after removal of supports for moulds and after appropriate painting,normally with white colour

Tile laying-toilet floors and walls




Picture shows servant toilet tile laid on floor and walls before pointing and finishing. Picture showing blue base wall tile ,glass border with etched painting border and White top layer wall tiles are for Ground Floor toilets near bed rooms

Wednesday, October 8, 2008

Tile laying on Toilet walls


Tile laying on toilet walls is nearing completion for Common toilet in Ground Floor,First Floor rear toilet and Servant toilet.Picture shows wall tile laid before pointing edges and finishing

Tuesday, September 30, 2008

Flooring and tile laying for toilets


Raw silk granite slab of size,5 feet by 10 feet, Galaxy Granite tiles of 45 x 45 cms and designer tiles of Johnson make for different toilet floors and walls with modern concept type arrangement are purchased and tile laying work has started from today.Ground Floor bed room toilet walls have the latest two feet long ceramic tiles along with special border tiles.Picture shows Raw silk granite slab kept at site

Mukhappu




Slope roofs were plastered and three Mukhappu on top of slope roofs are now visible after plastering.we will now do design work on these Mukhappu to give an appearance , elegant and beautiful with the rich traditions of Kerala Architecture

Slope sunshade-Ground Floor


Picture shows front slope sunshade in Ground Floor after concreting

Slope roof concreting


Picture shows two slope roofs side by side in the front ,one after concreting and another being concreted

First Floor brick work


Picture shows first floor Brick work and fixing of doors and windows for first Floor

Curing after concrete


Picture shows part of Ground Floor roof after concreting being cured with water kept with brick at the ends

Roof concreting-Ground Floor


Flat roof concreting of ground floor done after car porch roof concreting at a lower level.Picture shows part of Ground Floor flat roof ready for concrete after steel work

Sunday, September 28, 2008

Car porch roof after concreting


Picture shows car porch for two cars after concreting

Car porch roof concreting


Picture shows car porch roof getting ready for concreting after steel reinforcement work

Lintel of Ground Floor


Picture shows site after Lintel concreting with doors and window frames fixed

Reaching lintel level


After filling basement,Brick work started.Picture shows reaching lintel level of Ground floor

Friday, September 26, 2008

Foundation work


After concrete piling and filling,we have done Foundation beam and to raise floor height,we have done brick work for basement.After brick work for basement a damp proof concrete was done on the foundation line

Review of construction progress


As the site is near lake at Vyttila,soil is clay and hence we have done concrete piling compaction type