Monday, December 28, 2009

Interlock tile laying for car porch and other areas

Interlock tiles with design and pattern with special grip on top is laid for car porch and other areas in front and area near kitchen.Picture shows interlock tiles laid which do not have concrete base and thus allow rain water to fall down to earth unlike earlier floor tiles laid on concreted surface which do not allow water sinking into earth.This tile is thus ecofriendly

Other front side views of house nearing completion also seen

DSC03066

DSC03068

DSC03069

DSC03071

DSC03072

DSC03074

DSC03075

DSC03076

DSC03077

DSC03078

Tuesday, December 15, 2009

Clay tile flooring for rooms

Picture show clay tile flooring after polyurethane coating

DSC03046

Thursday, December 3, 2009

Gate Pillars getting completed

Picture shows gate pillars with bamboo design done on all three pillars

DSC03028

Thursday, November 26, 2009

Gate pillars with bamboo design tiles

Work on gate pillars with bamboo design tiles started.Pictures  showwork in progress.Water connection obtained and connection done today,26/11.KSEB inspection over and payment for three phase regular connection will be done next day

Saturday, November 21, 2009

Painting work nearing completion

Painting work is nearing completion.Solar water heater reached site and is being installed
Pictures follows.













Tuesday, November 3, 2009

Wednesday, October 28, 2009

Painting continues

Painting work continues.Pictures show work in progress



Saturday, October 17, 2009

Painting in progress









Pictures show progress of exterior painting

Saturday, October 10, 2009

Painting reaching exterior areas



Inside  walls painting,door window painting,clay tile painting are all coming up to reach final stage.It is too early to put pictures.Still I am loading a picture now

Saturday, May 9, 2009

Additional water sump tank

Installation of additional 3000 litres water sump tank is completed.Man hole cover of the earlier sump tank is also replaced

Tuesday, May 5, 2009

Our Blogs on Kerala Architecture, House construction, interior design, Kerala life, travel and politics

Completed works
http://kerala-houseconstruction-irinjalakuda.blogspot.com/
http://kerala-houseconstruction-cochin.blogspot.com/
Work in progress
http://kerala-houseconstruction-vyttila.blogspot.com/
http://kerala-houseconstruction-nilambur.blogspot.com/
http://kerala-houseconstruction-ranni.blogspot.com/
http://kerala-houseconstruction-josephneroth.blogspot.com/
http://kerala-houseconstruction-sunny.blogspot.com/
http://kerala-houseconstruction-cherthala.blogspot.com/
http://kerala-houseconstruction-elamakkara.blogspot.com/
http://tamilnadu-houseconstruction-ootty.blogspot.com/
Blog and Knoll on Kerala Architecture
http://knol.google.com/k/thomas-viruvelil/kerala-architecture/
http://kerala-architects.blogspot.com/
Blog on Kerala life, Politics, travel and on Kerala Architecture
http://kerala-life.blogspot.com/
DISCLAIMER
Every effort is taken to provide you authentic information on Kerala Architecture and it is features and other relevant information on building a house in Kerala. VIRUVELIL group of Companies or V.H.Thomas or any person interacting through this website on behalf of VIRUVELIL group of companies will not be responsible for the authenticity or correctness of the information provided through this website or conveyed by email to any person contacting us for information, assistance, guidance or for any commercial activity related or followed after any enquiry or request for services /assistance/guidance
We do not accept responsibility for loss or damage arising from the use of the information provided through this website which may be creative work/technical data without our consent/involvement and guidance. We have complete, unchallenged copy right for all information, data, pictures, design details provided through this website. Any dissemination, use, review, distribution, printing or copying in part or full of information, data, pictures design details provided through this website is strictly prohibited.

Saturday, May 2, 2009

Installing additional water sump tank


Additional water sump tank of 3000 litres is installed close to existing water sump tank and inter connection is also done.Picture shows work in progress

Friday, March 6, 2009

Interior wood work
















Interior wood work is nearing completion.Some pictures of stair posts,hand rails and master post with carvings can be seen

Thursday, February 12, 2009

Cup boards and dressing table




Pictures shows cupboards in bed rooms and dressing table portions with woodden carvings being kept at site for interior work

Friday, February 6, 2009

Interior wood work in progress







Pictures shows interior wood work in progress for Kitchen,Work area and Living room panelling