Tuesday, September 30, 2008

Flooring and tile laying for toilets


Raw silk granite slab of size,5 feet by 10 feet, Galaxy Granite tiles of 45 x 45 cms and designer tiles of Johnson make for different toilet floors and walls with modern concept type arrangement are purchased and tile laying work has started from today.Ground Floor bed room toilet walls have the latest two feet long ceramic tiles along with special border tiles.Picture shows Raw silk granite slab kept at site

Mukhappu




Slope roofs were plastered and three Mukhappu on top of slope roofs are now visible after plastering.we will now do design work on these Mukhappu to give an appearance , elegant and beautiful with the rich traditions of Kerala Architecture

Slope sunshade-Ground Floor


Picture shows front slope sunshade in Ground Floor after concreting

Slope roof concreting


Picture shows two slope roofs side by side in the front ,one after concreting and another being concreted

First Floor brick work


Picture shows first floor Brick work and fixing of doors and windows for first Floor

Curing after concrete


Picture shows part of Ground Floor roof after concreting being cured with water kept with brick at the ends

Roof concreting-Ground Floor


Flat roof concreting of ground floor done after car porch roof concreting at a lower level.Picture shows part of Ground Floor flat roof ready for concrete after steel work

Sunday, September 28, 2008

Car porch roof after concreting


Picture shows car porch for two cars after concreting

Car porch roof concreting


Picture shows car porch roof getting ready for concreting after steel reinforcement work

Lintel of Ground Floor


Picture shows site after Lintel concreting with doors and window frames fixed

Reaching lintel level


After filling basement,Brick work started.Picture shows reaching lintel level of Ground floor

Friday, September 26, 2008

Foundation work


After concrete piling and filling,we have done Foundation beam and to raise floor height,we have done brick work for basement.After brick work for basement a damp proof concrete was done on the foundation line

Review of construction progress


As the site is near lake at Vyttila,soil is clay and hence we have done concrete piling compaction type